Sunday, September 11, 2011
More hard work
Now, more on catching up. Last I posted about the house remodeling we were pulling up carpet and baring the concrete floors. Well, there was more of that to do and it required pulling up small glazed tiles that were apparently cemented to the cement. Argh.
The darn tiles were super slippery and not level. They were a type of saltillo but had a thick glaze on top.
It took a jack hammer and a whole lot of grunting, swearing and other assorted sound effects to get it all up. They were clay based tiles too so red dust was everywhere and EVERYTHING was red when we were finished and stayed that way for a LONG time.
Ugh.
Click here to see more: Bare Floors and Red Dust
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment